Power Shutdown at HMC Sunday September 20, 2015.

Due to construction of Phase 2 at the HMC Campus, power will be shut down to the entire campus from 7 am – 1 pm Sunday Sept 20 and will be closed. The library will be in operation from 1pm – 4pm instead of regular Sunday hours (11-4pm). Davis and Trafalgar libraries will be open regular hours. If you need assistance, please visit http://library.sheridancollege.ca to chat virtually and to use the e-resources.